Hurdles still high for PH nuclear energy dev’t

The country’s target to introduce nuclear energy into the local power mix by 2032 remains an iffy proposition for industry stakeholders, as local players have yet to show the capacity to build the needed infrastructure and raise the hefty budget required. This reality check on the planned nuclear deployment was one of the topics at
Read The Rest at :