First chip from Dholera plant by 2026 end: PSMC chairman Frank Huang

Frank Huang, chairman of PSMC, told ET that the first semiconductor chip from the new plant being set up by the Tata Group and Taiwan’s Powerchip Semiconductor Manufacturing Corporation (PSMC) in Gujarat’s Dholera, will be ready to roll out by the end of 2026.
Read The Rest at :