Alternergy seeks go-ahead for P2.2-B project

The subsidiary of listed Alternergy Holdings Corp. formally sought the Energy Regulatory Commission’s (ERC) green light to proceed with the construction of a transmission facility designed to link its Tanay wind park to the Luzon grid. Based on its filing at the ERC, Alternergy Tanay Wind Corp. (ATWC) intends to build dedicated point-to-point limited transmission
Read The Rest at :