BHEL has secured a contract from NTPC to establish the main plant for the 3x800 MW Telangana Stage-II supercritical thermal power plant. The scope of work includes design, engineering, manufacturing, supply, erection, commissioning, and civil construction. BHEL has already received a Limited Notice to Proceed, allowing them to begin basic engineering work. Read The Rest at :
Disclaimer : Mymoneytimes implements extreme caution and care in collecting data before publication. Mymoneytimes does not liable for the adequacy, accuracy or completeness of any given information. Hence we are not liable for any kind of direct or indirect loss caused by the use of such information.