The total length of the Final Location Survey sanctioned is 1275.50 km. The total length of the Final Location Survey for New Railway Lines connecting Bangladesh is 861 km, and with Nepal is 202.5 km. The proposed alternate routes towards Northeast will be of 212 km length. Read The Rest at :
Disclaimer : Mymoneytimes implements extreme caution and care in collecting data before publication. Mymoneytimes does not liable for the adequacy, accuracy or completeness of any given information. Hence we are not liable for any kind of direct or indirect loss caused by the use of such information.