JSW Energy's subsidiary, JSW Neo Energy, has secured a 192-MW hybrid power project, including an additional 96 MW under a greenshoe option from Gujarat Urja Vikas Nigam. The project is part of a 500 MW Grid connected Hybrid Power Projects Phase II. The company's total locked-in generation capacity has increased to 16.2 GW, including 2.1 GW of hybrid capacity. Read The Rest at :
Disclaimer : Mymoneytimes implements extreme caution and care in collecting data before publication. Mymoneytimes does not liable for the adequacy, accuracy or completeness of any given information. Hence we are not liable for any kind of direct or indirect loss caused by the use of such information.