Boeing given 90 days by FAA to come up with a plan to improve safety and quality of manufacturing

The new deadline is being set as the FAA finishes an audit of assembly lines at the factory near Seattle, where Boeing builds planes like the 737 Max that suffered a door-panel blowout in January. Investigators say bolts that help keep the panel in place were missing after repair work on the Alaska Airlines jet at the Boeing factory.
Read The Rest at :